Electric Rates
Effective Date
These rates are effective as of October 1, 2025. (Section 13.05.031, Ordinance 1104)
Power Cost Adjustment Calculation
Net Power Supply Cost (1) ($) / (2) Net kWh sold = Power Cost Adjustment (PCA)
(1) Power Supply Cost ($) including generation, transmission, regulatory and other costs charged to the City by its supplier for the retail billing period.
(2) Total kilowatt-hours consumption sold to retail customers for the retail billing period.
Inside City Limits Sales Tax
- Residential: 2.00% (1.00% City, .25% EDC, .75% County)
- Commercial: 8.25% (6.25% State, 1.00% City, .25% EDC, .75% County)
Residential
| Item | Fee |
|---|---|
| Customer Meter Charge |
$10.25 per month |
| Distribution Charge |
$0.0720 per kWh for all kWh per month |
| Plus Power Cost Adjustment |
A component adjusted monthly based on wholesale power costs |
Small Commercial
| Item | Fee |
|---|---|
| Customer Meter Charge | $12.25 per month |
| Distribution Charge |
$0.0630 per kWh for all kWh per month |
| Plus Power Cost Adjustment | A component adjusted monthly based on wholesale power costs |
Large Commercial
| Item | Fee |
|---|---|
| Meter Service Charge | $22.25 per month |
| Distribution Charge |
$0.0451 per kWh for all kWh per month |
| Demand Charge |
$3.92 per kW |
| Plus Power Cost Adjustment | A component adjusted monthly based on wholesale power costs |
Industrial
| Item | Fee |
|---|---|
| Customer Meter Charge |
$1,000 per month for service |
| Distribution Charge |
$0.0351 per kWh for all kWh |
| Demand Charge per kW |
$3.92 per kW |
| Plus Power Cost Adjustment |
A component adjusted monthly based on wholesale power costs |
Distributed Generation
Ordinance 1245
- The Brady Electric Utility will determine the Delivered kWh and the Received kWh on an ongoing monthly basis
- Delivered kWh (energy) will be billed on the standard applicable rate schedule.
- Received kWh (energy) will be multiplied by the utility's Avoided Cost of Generation Rate (ACGR).
- ACGR is based on the actual cost of generation from the City of Brady's wholesale supplier(s) divided by the total retail sales by the City for the billing period.
- Any credit related to the ACGR shall be remitted by the Brady Utility billing service to the Customer in the billing period that the energy received was metered.
- A one-time non-refundable installation set-up fee of $50 will be required.
- A monthly meter data processing fee will be charged at the rate of $3 per billing cycle.
- The actual cost of the specialized DG meter will be charged to the Customer.
- Penalty: $1,000 if the solar company starts work or energizes without inspections and approvals.
Transformer Installation Fee
The Electric Division will neither start work nor will the Electric Division order materials until it receives payment in full.
Residential
| Transformers, kVA/$ Fee | CT Metering Set |
|---|---|
| 15kVA / $1,200 | $0 Charge applies to a single-use customer |
| 25kVA / $1,400 | $0 Charge applies to a single-use customer |
Small Commercial
| Transformers, kVA/$ Fee | CT Metering Set |
|---|---|
| 50kVA / $1,800 | $0 |
| 100kVA / $2,000 | $0 |
Large Commercial
| Transformers, kVA/$ | CT Metering Set |
|---|---|
| 50kVA / actual cost | Actual cost |
| 100kVA / actual cost | Actual cost |
| Greater than 100kVA | Actual Cost |
| Pad Mounted | Actual Cost |
Onsite monthly meter reading fee: $15
Advanced Meter Opt-out Program Fees
| Item | Fee |
|---|---|
| Exchange fee from advanced to digital meter | $50 |
| Onsite monthly meter reading fee | $15 |