Electric Rates
Effective Date
These rates are effective as of October 1, 2022. (Section 13.05.031, Ordinance 1104)
Power Cost Adjustment Calculation
Net Power Supply Cost (1) ($) / (2) Net kWh sold = Power Cost Adjustment (PCA)
(1) Power Supply Cost ($) including generation, transmission, regulatory and other costs charged to the City by its supplier for the retail billing period.
(2) Total kilowatt-hours consumption sold to retail customers for the retail billing period.
Inside City Limits Sales Tax
- Residential: 2.00% (1.00% City, .25% EDC, .75% County)
- Commercial: 8.25% (6.25% State, 1.00% City, .25% EDC, .75% County)
Residential
Item | Fee |
---|---|
Customer Meter Charge |
$10.25 |
Distribution Charge per kWh | $ 0.0720 |
Plus Power Cost Adjustment |
A component adjusted monthly based on wholesale power costs |
Small Commercial
Item | Fee |
---|---|
Customer Meter Charge | $12.25 |
Distribution Charge per kWh |
$0.0630 |
Plus Power Cost Adjustment |
A component adjusted monthly based on wholesale power costs |
Large Commercial
Item | Fee |
---|---|
Customer Meter Charge |
$22.25 |
Distribution Charge per kWh |
$0.0451 |
Demand Charge per kW |
$3.92 |
Plus Power Cost Adjustment |
A component adjusted monthly based on wholesale power costs |
Industrial
Item | Fee |
---|---|
Customer Meter Charge |
$1,000 |
Distribution Charge per kWh | $0.0351 |
Demand Charge per kW |
$3.92 |
Plus Power Cost Adjustment |
A component adjusted monthly based on wholesale power costs |
Distributed Generation
- The Brady Electric Utility will determine the Delivered kwh and the Received kWh on an ongoing , monthly basis
- Delivered kWh (energy) will be billed on the standard applicable rate schedule.
- Received kWh (energy) will be multiplied by the utility's Avoided Cost of Generation Rate (ACGR).
- ACGR is based on the actual cost of generation from the City of Brady's wholesale supplier(s) divided by the total retail sales by the City for the billing period.
- Any credit related to the ACGR shall be remitted by the Brady Utility billing service to the Customer in the billing period that the energy received was metered.
- One-time non refundable installation set up fee of $50 will be required.
- Monthly meter data processing fee will be charged at the rate of $3 per billing cycle.
- Actual cost of specialized DG meter will be charged to the Customer.
- Penalty: $1,000 if the solar company starts work or energizes without inspections and approvals.
Electric Commercial Fees
Ordinance 1104
Small Commercial
Transformers, kVA/$ | CT Metering Set |
---|---|
15kVA / $350 | $0 |
25kVA / $500 | $0 |
Large Commercial
Transformers, kVA/$ | CT Metering Set |
---|---|
50kVA / $750 | $750 |
100kVA / $1.000 | $1,000 |
Greater than 100kVA | Actual Cost |
Pad Mounted | Actual Cost |